29th Street Pump Station Remove and replace existing pumps and install new flow meter, transformer, electrical gear and VFDs Owner: City of Loveland | Engineer: Brown and Caldwell Project Schedule: 10/2008 - 4/2009 | Progress: 70% | Value: $368,861
Installation of new exhaust fans, VFDs and emergency generator for underground pump station
Owner: Left Hand Water District | Engineer: Burns and McDonnell Project Schedule: 10/2008 - 4/2009 | Progress: 40% | Value: $164,960
Water World Amusement Park - Lazy River Headworks Replacement Replace distribution pipe system for Lazy River Rafting ride
Owner: Hyland Hills Park and Rec Dist. | Engineer: Hyland Hills Park and Rec Dist. Project Schedule: 2/2009 - 4/2009 | Progress: 10% | Value: $143,500
Regional Pumping Facility
Construction of a pumping facility and associated site improvements to handle potable water, non-potable water and storm water runoff
Owner: Parker Water and Sanitation District | Engineer: Integra Engineers Project Schedule: 8/2007-10/2008 | Value: $$5,383,040
Intermountain Water Storage Tank Vail, CO
Construction of a post tension water storage tank
Owner: Eagle River Water and Sanitation District | Engineer: Bates Engineering Project Schedule: 8/2006 - 10/2008 | Value: $2,565,037
Laramie WWTP Main Pump Station
Addition to main pump station to include new building and equipment
Owner: City of Laramie | Engineer: The Engineering Company Project Schedule: 9/2007-10/2008 | Value: $2,401,209
St. Vrain Pump Station
Construction of a pumping station and associated site improvements
Owner: St. Vrain Sanitation District | Engineer: The Engineering Company Project Schedule: 3/2008 - 10/2008 | Value: $488,651
Thornton-North Washington Lift Station Renovation to a lift station to include demolition and installation of pumps and associated controls and electrical work. Owner: Metro Wastewater Reclamation District | Engineer: Boyle Engineering Project Schedule: 5/2007-3/2008 | Value: $467,365
Gantry Crane Denver, CO
Installation of a crane and lifting beam assembly Owner: US Army Corp of Engineers | Engineer: US Army Corp of Engineers Project Schedule: 11/200-7/2008 | Value: $363,921
Town of Windsor and Greenspire Non-Potable Irrigation Pump Station Windsor, CO
Construction of pump station to provide irrigation water for a park system and residential subdivision
Owner: Town of Windsor and Greenspire | Engineer: Aqua Engineering Project Schedule: 11/2007-3/2008 | Value: $713,814
Secondary Denitrification Denver, CO
Retrofit garage area to a chemical storage room
Owner: Metro Wastewater | Engineer: Carollo Engineers Project Schedule: 9/2007-5/2008| Value: $1,418,804
Reservoir 4A and 4B Parker, CO
Repair and clean two underground water storage tanks to include concrete patching, FRP ladder replacement and new access hatches
Owner: Pinery water and Wastewater District | Engineer: Pinery water and Wastewater District Project Schedule: 3/2008-4/2008| Value: $60,575
Silt Water Tank Silt, CO
Prepare sub-grade and install piping for a 600,000 gallon steel water tank to be constructed
Owner: Town of Silt | Engineer: Schmueser Gordon Meyer Project Schedule: 8/2007 - 10/2007 | Value: $327,000
Garden City Lift Station Greeley, CO
Replace aging pump skid and wetwell piping for residential lift station
Owner: City of Greeley | Engineer: City of Greeley Project Schedule: 6/2007 - 10/2007 | Value: $105,400
CU Boulder Steam Tunnel Repair Boulder, CO
Repair, reinforce and waterproof existing steam tunnel
Owner: University of Colorado at Boulder | Engineer: University of Colorado at Boulder Project Schedule: 6/2007 - 8/2007 | Value: $188,325
Mount Vernon Wastewater System Improvements Golden, CO
Construction of aerated lagoon wastewater treatment system with fine bubble aeration, a chlorine contact chamber and sand filters.
Owner: Mount Vernon Country Club | Engineer: AMEC Earth and Environmental Project Schedule: 6/2007 - 12/2007 | Value: $581,572
South Finished Water Tank Clifton, CO
Construction of a new steel water storage tank and associated piping and electrical modifications
Owner: Clifton Water District | Engineer: Burns and McDonnel Project Schedule: 5/2007 - 12/2007 | Value: $1,075,384
Dawson Irrigation Wells Clifton, CO
Submersible pump installation and outfitting of three well sites and a diversion valve site
Owner: Pinery Water and Wastewater District | Engineer: Integra Engineering Project Schedule: 5/2007 - 11/2007 | Value: $363,765
Water World Octopus Racer Federal Heights, CO
Construction of a specialized mechanical and plumbing system to include filtration and chemical feed system.
Owner: Highland Hills Park and Recreation | Engineer: Water Technologies, Inc. Project Schedule: 5/2007-8/2007 | Value: $512,625
New Castle Water Treatment Plant Expansion New Castle, CO
Installation of filtration treatment unit and improvements to existing pipe and pump systems
Owner: Town of New Castle| Engineer: Schmueser Gordon Meyer Project Schedule: 3/2007-8/2007 | Value: $106,206
Red Sky Ranch Water Treatment Improvements Denver, CO
Addition of GAC contacting treatment unit and improvements to existing piping and controls
Owner: Holland Creek Metro District | Engineer: Schmueser Gordon Meyer Project Schedule: 1/2007-8/2007 | Value: $197,094
Town of Windsor and Greenspire Non-Potable Irrigation Pump Station Phase I Windsor, CO Construction of an intake line and wetwell
Owner: Town of Windsor | Engineer: Aqua Engineering Project Schedule: 1/2007-5/2007 | Value: $439,250
Alluvial Well Facility Denver, CO
Construction of pump houses, pipelines, concentrate sump and electrical systems
Owner: Town of Milliken | Engineer: RG Consulting Engineers Project Schedule: 1/2007-5/2007 | Value: $425,725
Avon WWTP, Edwards WWTP and Avon Drinking Water Facility Avon, CO and Edwards, CO
Modifications to existing WWTF and drinking water facility to include upgraded chemical feed system Owner: Eagle River Water and Sanitation District | Engineer: Brown and Caldwell Project Schedule: 8/2006-5/2007 | Value: $4,963,710
Avon and Edwards Drinking Water Facility - Sand Separator Avon, CO and Edwards, CO Construction of an overflow manhole and sand separator
Owner: Upper Eagle Regional Water Authority | Engineer: HDR Engineering Project Schedule: 8/2006-1/2007 | Value: $376,528
Castlewood Pump Station Denver, CO
Construction of a potable water pump station
Owner: Denver Water | Engineer: Denver Water Project Schedule: 10/2006-4/2007 | Value: $291,246
Platteville Water Treatment Plant Platteville, CO
Improvements to chlorine basin and aeration system
Owner: Town of Platteville | Engineer: Ketterling, Butherus and Norton Project Schedule: 7/2007-11/2007 | Value: $327,487
Glenwood Springs Secondary Digester Cover Replacement Glenwood Springs, CO
Secondary digester cover replacement
Owner: City of Glenwood Springs | Engineer: Burns and McDonnell Project Schedule: 7/2006-11/2006 | Value: $270,404
Eastern Water Treatment Plant Filter Modification Castle Rock, CO
Open media filter modification
Owner: Town of Castle Rock | Engineer: HDR Engineering Project Schedule: 1/2007-4/2007 | Value: $78,982
Tank No. 9B Parker, CO
Construction of a post tension water storage tank
Owner: Pinery West Metropolitan District| Engineer: Bates Engineering Project Schedule: 9/2005 - 11/2006 | Value: $1,075,450
Laramie East Side Tank Laramie, WY
Modifications of existing pump stations and sewer lines, and construction of new pump stations
Owner: City of Laramie | Engineer: Wester-Wetstein and Associates Project Schedule: 8/2005 - 12/2007 | Value: $4,973,439
Grange Hall Lift Station Thornton, CO
Construction of a sub-grade sanitary sewer lift station
Owner: City of Thornton | Engineer: Boyle Engineering Project Schedule: 2/2006-8/2006 | Value: $593,419
Berkeley Park Pump Station Denver, CO
Construction of an irrigation pump station
Owner: City and County of Denver | Engineer: City and County of Denver Project Schedule: 11/2005 - 10/2006 | Value: $253,771
Ruby Hill Pump Station Denver, CO
Irrigation modifications and booster pump station
Owner: City and County of Denver | Engineer: City and County of Denver Project Schedule: 2/2006-10/2006 | Value: $196,476
Eastern Water Treatment Plant HVAC Modifications Castle Rock, CO
HVAC modifications
Owner: Town of Castle Rock | Engineer: HDR Engineering Project Schedule: 2/2006-7/2006 | Value: $126,011
Castle Pines Lift Station No. 3 Castle Rock, CO
Replacement of owner furnished pumps and installation of overflow manhole
Owner: Castle Pines North Metropolitan District| Engineer: Rothberg, Tamburini and Winsor Project Schedule: 2/2006-6/2006 | Value: $177,982
Hutchinson Pump Station Aurora, CO
Construction of a pump station
Owner: City of Aurora | Engineer: HDR Engineering Project Schedule: 2/2006-5/2006 | Value: $301,994
Woman Creek Outlet Modifications Westminster, CO
Installation of meter vaults, pumps and gates
Owner: Woman Creek Reservoir Authority | Engineer: Deere and Ault Consultants Project Schedule: 2/2006-5/2006 | Value: $190,820
Senac Cove Pond Pump Station Aurora, CO
Construction of a pump station and dam spillway
Owner: City of Aurora | Engineer: Rothberg, Tamburini and Winsor Project Schedule: 2/2006-5/2006 | Value: $914,642
High Plains Lift Station Aurora, CO
Construction of a sub-grade sanitary sewer lift station
Owner: City of Aurora | Engineer: Stantec Project Schedule: 5/205 - 10/2005 | Value: $861,705
Boyd Lake Water Treatment Plant Loveland, CO
Construction of a chemical storage building used for potable water treatment
Owner: City of Greeley | Engineer: Burns & McDonnell Project Schedule: 2/2005 - 10/2005 | Value: $725,886
Edwards Wastewater Treatment Plant Vail, CO
Modifications to the locker room, upgrading an odor control system and replacing the outdated HVAC system
Owner: Eagle River Water and Sanitation District | Engineer: Brown and Caldwell Project Schedule: 2/2005 - 9/2005 | Value: $822,054
Spurgeon Water Tank Niwot, CO
Demolition of existing access hatch and tank vents and construction of new access hatch and tank vents, in addition to concrete repair
Owner: Left Hand Water District | Engineer: Bates Engineering Project Schedule: 1/2005 - 5/2005 | Value: $112,805
Turnberry Meadows Lift Station Commerce City, CO
Construction of a sub-grade sanitary sewer lift station
Owner: South Adams County Water and Sanitation District | Engineer: Black and Veatch Project Schedule: 2/2005 - 7/2005 | Value: $674,328
Rocky Flats Industrial Water Project Golden, CO Installation of point of use water filtration and treatment system
Developer: RAC Development | Engineer: Jehn Engineering Project Schedule: 11/2004 - 12/2004 | Value: $79,027
Gilcrest Lagoon Lining Gilcrest, CO
Furnish and install wastewater treatment plant lagoon lining
Owner: Town of Gilcrest | Engineer: RG Consulting Engineers, Inc. Project Schedule: 10/2004 - 8/2005 | Value: $156,976
Reservoir 4 Water Storage Tank Parker, CO
Construction of a post tension water storage tank
Owner: Pinery Water and Wastewater District | Engineer: Bates Engineering Project Schedule: 12/2004 - 5/2005 | Value: $962,587
124th Avenue Pump Station Brighton, CO
Installation of wet well submersible pumps, slide gates and water flow meters
Developer: Tetra Tech Construction | Engineer: Tetra Tech Construction Project Schedule: 10/2004 - 11/2004 | Value: $32,235
Screw Pump Installation Frederick, CO
Installation of owner furnished screw pump
Owner: Weld County Tri-Area Sanitation District | Engineer: Burns & McDonnell Project Schedule: 9/04 - 11/04 | Value: $73,308
Mitchell Creek Hatches
Installation of hatches, handrail, pump, piping and hoist crane base
Owner: Town of Castle Rock | Engineer: Town of Castle Rock Project Schedule: 8/04 - 9/04 | Value: $10,687
Well Facilities Parker, CO Construction of three well facilities and all necessary appurtenances
Owner: Meridian Metropolitan District | Engineer: Tetra Tech RMC Project Schedule: 6/2004 - 5/2005 | Value: $1,733,842
Joder Water Storage Tank Boulder, CO
Construction of a post tension water storage tank
Owner: Left Hand Water District | Engineer: Bates Engineering Project Schedule: 5/2004 - 3/2005 | Value: $956,000
Well Sites 4 & 9 Peyton, CO
Construction of two well vaults with all pumps, valves and fixtures
Owner: Meridian Service Metro District | Engineer: URS Corporation Project Schedule: 5/04 - 8/04 | Value: $542,313
Bennett Pump Station Bennett, CO
Design/Build of pump station
Owner: Town of Bennett | Engineer: Jehn Engineering Project Schedule: 4/2004 - 8/2004 | Value: $301,388
Woody Creek Wastewater Treatment Plant Aspen, CO
Construction of a new wastewater treatment plant
Owner: Aspen Pitkin County Housing Authority Project Schedule: 3/2004 - 5/2005 | Progress: 100% | Value: $845,299
Reservoir 2 & 3 Parker, CO
Demolition of existing access hatch and tank vents, and construction of new access hatch and tank vents
Owner: Pinery Water and Wastewater District | Engineer: Bates Engineering Project Schedule: 2/2004 - 8/2004 | Value: $234,570
Meadows Siphon Facility Sewerage Grinder Project Castle Rock, CO
Construction of a grinder vault, temporary bypass with no shutdown
Owner: Town of Castle Rock | Engineer: URS Corporation Project Schedule: 1/2004 - 7/2004 | Value: $204,161
Roxborough Park Water Treatment Plant Improvements Project Littleton, CO
Replacement of existing chemical feed systems, flocculators, submersible pumps, filter gallery piping, installation of new floating decanter, underground piping, VFD, concrete repairs
Owner: The Roxborough Park Metropolitan District | Engineer: TST Infrastructure, LLC Project Schedule: 1/2004 - 6/2004 | Value: $517,322
Bell Cross Ranch Pump Station Parker, CO
New potable water pump station, masonry building, and landscaping
Owner: Parker Water and Sanitation District | Engineer: RG Consulting Engineers, Inc. Project Schedule: 11/2003 - 6/2004 | Value: $474,532
Installation of UV Disinfection System Fountain, CO
Modification of an existing contact basin for installation of a UV disinfection system
Owner: Security Sanitation District | Engineer: Eckert Energy Efficiency Engineering Project Schedule: 9/2003 - 12/2003 | Value: $101,108
Genesee Box Culvert Entrance Golden, CO
Modification of an existing buried pump station to provide ground level access
Owner: Genesee Water & Sanitation District | Engineer: Genesee Water & Sanitation District Project Schedule: 7/2003 - 8/2003 | Value: $17,984
Lincoln Meadows Sewage Lift Station Parker, CO
Construction of a new sewage lift station, 15' below ground water in sandy soil
Owner: Lincoln Meadows Metropolitan District | Engineer: EVO Consulting Services, Inc. Project Schedule: 6/2003 - 12/2003 | Value: $368,543
Grapevine Hollow Pump Station Greeley, CO
Construction of an irrigation pump station and pond aeration system
Developer: Union Colony Excavating | Engineer: Drexel, Barrell & Co. Project Schedule: 4/2003 - 4/2003 | Value: $218,200
Mitchell Creek Lift Station Castle Rock, CO
Modification of an existing aeration basin to a wet well/dry well sanitary pump station, new masonry building, and demolition of old station
Owner: Town of Castle Rock | Engineer: HDR Engineering Inc. Project Schedule: 2/2003 - 8/2003 | Value: $970,841
Secondary Clarifier Treatment Improvements Project Loveland, CO
Replacement of clarifier mechanisms, regrouting of clarifier slab, and concrete repair
Owner: City of Loveland | Engineer: CH2M Hill Project Schedule: 2/2003 - 10/2002 | Value: $244,868
Replacement of multishaft centrifugal pumps and installation of new polymer feed system
Owner: Metro Wastewater Reclamation District | Engineer: Carollo Engineers Project Schedule: 6/2002 - 4/2003 | Value: $492,072
Strontia Springs Dam Intake Tower – Jib Crane Replacement Denver, CO
Replacement of an existing 12 ton jib crane
Owner: Denver Water | Engineer: Denver Water Project Schedule: 4/2002 - 8/2002 | Value: $168,545
Genesee Terrace Lift Station Golden, CO
Construction of a new wet well/dry well wastewater pumping station
Owner: Genesee Water & Sanitation District | Engineer: Jacobson Helgoth Consultants Project Schedule: 4/2002 - 11/2002 | Value: $493,840
Installation of Pump Station at Sanborn Park Greeley, CO
Replacement of pump equipment, associated piping and minor site development
Owner: City of Greeley | Engineer: City of Greeley Project Schedule: 3/2002 - 4/2002 | Value: $23,881
Lincoln Junior High School Pump Station Fort Collins, CO
Supply and installation of a pumping system for turf irrigation
Owner: Poudre School District R-1 | Engineer: Poudre School District Project Schedule: 2/2002 - 5/2002 | Value: $48,462
Glen Grove Water Treatment Plant Filter Replacement and Site Modifications Perry Park, CO
Refurbishment of potable water pressure filters, new chemical storage facility, relocation of chemical systems, piping modifications and site development
Owner: Perry Park Water and Sanitation District | Engineer: The Engineering Company Project Schedule: 12/2001-4/2002 | Value: $130,000
City of Black Hawk Water System Improvements Black Hawk, CO
Construction of potable water pump station, PRV vault, existing utility modifications, controls and minor site development
Owner: City of Black Hawk | Engineer: Richard P. Arber Associates Project Schedule: 12/2001 - 6/2002 | Value: $287,557
Maplewood Estates Off-Site Sewer & Lift Station Improvements Eaton, CO
Subcontract work for construction of non-potable water lift station, including wetwell, pumping system, controls, and minor site development
Owner: Town of Eaton | Engineer: Ketterling, Butherus & Norton Engineers, LLC General Contractor: Farner Enterprises Project Schedule: 10/2001 - 4/2002 | Value: $74,200
|