29th Street Pump Station

Remove and replace existing pumps and install new flow meter, transformer, electrical gear and VFDs

Owner:  City of Loveland | Engineer:  Brown and Caldwell

Project Schedule: 10/2008 - 4/2009 | Progress: 70% | Value:  $368,861

 

Niwot Pump Station

 

Installation of new exhaust fans, VFDs and emergency generator for underground pump station

 

Owner:  Left Hand Water District | Engineer:  Burns and McDonnell

Project Schedule: 10/2008 - 4/2009 | Progress: 40% | Value: $164,960

 

Water World Amusement Park - Lazy River Headworks Replacement

Replace distribution pipe system for Lazy River Rafting ride

 

Owner:  Hyland Hills Park and Rec Dist. | Engineer:  Hyland Hills Park and Rec Dist.

Project Schedule: 2/2009 - 4/2009 | Progress: 10% | Value: $143,500

 

 

 

Regional Pumping Facility

 

 

   Construction of a pumping facility and associated site improvements to handle potable water,

non-potable water and storm water runoff

 

Owner: Parker Water and Sanitation District | Engineer: Integra Engineers

Project Schedule: 8/2007-10/2008 | Value: $$5,383,040

Intermountain Water Storage Tank

Vail, CO

 

 

Construction of a post tension water storage tank

 

Owner: Eagle River Water and Sanitation District  | Engineer: Bates Engineering

Project Schedule: 8/2006 - 10/2008 | Value:  $2,565,037

Laramie WWTP Main Pump Station

 

Addition to main pump station to include new building and equipment

 

Owner: City of Laramie | Engineer: The Engineering Company

Project Schedule: 9/2007-10/2008 | Value: $2,401,209

St. Vrain Pump Station

 

Construction of a pumping station and associated site improvements

 

Owner: St. Vrain Sanitation District | Engineer: The Engineering Company

Project Schedule: 3/2008 - 10/2008 | Value: $488,651

Thornton-North Washington Lift Station

Renovation to a lift station to include demolition and installation of pumps

and associated controls and electrical work.

Owner:  Metro Wastewater Reclamation District | Engineer: Boyle Engineering

Project Schedule: 5/2007-3/2008 | Value:  $467,365

 

Gantry Crane

Denver, CO

 

Installation of a crane and lifting beam assembly

Owner: US Army Corp of Engineers  | Engineer: US Army Corp of Engineers

Project Schedule: 11/200-7/2008 | Value:  $363,921

Town of Windsor and Greenspire Non-Potable Irrigation Pump Station

Windsor, CO

   

Construction of pump station to provide irrigation water for a  park system and residential subdivision

 

Owner: Town of Windsor and Greenspire  | Engineer: Aqua Engineering

Project Schedule: 11/2007-3/2008 | Value:  $713,814

Secondary Denitrification

Denver, CO

 

Retrofit garage area to a chemical storage room

 

Owner: Metro Wastewater | Engineer: Carollo Engineers

Project Schedule: 9/2007-5/2008| Value: $1,418,804

Reservoir 4A and 4B

Parker, CO

 

Repair and clean two underground water storage tanks to include concrete patching,

FRP ladder replacement and new access hatches

 

Owner: Pinery water and Wastewater District | Engineer: Pinery water and Wastewater District

Project Schedule: 3/2008-4/2008| Value: $60,575

Silt Water Tank

Silt, CO

                                         

                             

Prepare sub-grade and install piping for a 600,000 gallon steel water tank to be constructed

 

Owner: Town of Silt  | Engineer: Schmueser Gordon Meyer

Project Schedule: 8/2007 - 10/2007  | Value:  $327,000

Garden City Lift Station

Greeley, CO

 

Replace aging pump skid and wetwell piping for residential lift station

 

Owner: City of Greeley  | Engineer: City of Greeley

Project Schedule: 6/2007 - 10/2007  | Value:  $105,400

CU Boulder Steam Tunnel Repair

Boulder, CO

                                                            

                                                      

Repair, reinforce and waterproof existing steam tunnel

 

Owner:  University of Colorado at Boulder  | Engineer: University of Colorado at Boulder

Project Schedule: 6/2007 - 8/2007  | Value:  $188,325

Mount Vernon Wastewater System Improvements

Golden, CO

 

 

Construction of aerated lagoon wastewater treatment system with

fine bubble aeration, a chlorine contact chamber and sand filters.

 

Owner:  Mount Vernon Country Club  | Engineer:  AMEC Earth and Environmental

Project Schedule: 6/2007 - 12/2007  | Value:  $581,572

South Finished Water Tank

Clifton, CO

 

Construction of a new steel water storage tank and associated piping and electrical modifications

 

Owner:  Clifton Water District | Engineer:  Burns and McDonnel

Project Schedule:  5/2007 - 12/2007 | Value:  $1,075,384

   Dawson Irrigation Wells

Clifton, CO

                                               

                                       

Submersible pump installation and outfitting of three well sites and a diversion valve site

 

Owner:  Pinery Water and Wastewater District | Engineer:  Integra Engineering

Project Schedule:  5/2007 - 11/2007 | Value:  $363,765

Water World Octopus Racer

Federal Heights, CO

                                        

                                              

Construction of a specialized mechanical and plumbing system to include filtration and chemical feed system.

 

Owner:  Highland Hills Park and Recreation | Engineer:  Water Technologies, Inc.

Project Schedule:  5/2007-8/2007 | Value:  $512,625

New Castle Water Treatment Plant Expansion

New Castle, CO

                                        

                                              

Installation of filtration treatment unit and improvements to existing pipe and pump systems

 

Owner:  Town of New Castle| Engineer:  Schmueser Gordon Meyer

Project Schedule:  3/2007-8/2007 | Value:  $106,206

Red Sky Ranch Water Treatment Improvements

Denver, CO

                                                           

 

                           

Addition of GAC contacting treatment unit and improvements to existing piping and controls

 

Owner:  Holland Creek Metro District | Engineer:  Schmueser Gordon Meyer

Project Schedule:  1/2007-8/2007 | Value:  $197,094

Town of Windsor and Greenspire Non-Potable Irrigation Pump Station

Phase I

Windsor, CO

   Construction of an intake line and wetwell

 

Owner:  Town of Windsor | Engineer:  Aqua Engineering

Project Schedule:  1/2007-5/2007 | Value:  $439,250

Alluvial Well Facility

Denver, CO

                                     

                                

Construction of pump houses, pipelines, concentrate sump and electrical systems

 

Owner:  Town of Milliken | Engineer:  RG Consulting Engineers

Project Schedule:  1/2007-5/2007 | Value:  $425,725

Avon WWTP, Edwards WWTP and Avon Drinking Water Facility

Avon, CO and Edwards, CO

                                     

                                

Modifications to existing WWTF and drinking water facility to include upgraded chemical feed system                     

Owner:  Eagle River Water and Sanitation District | Engineer:  Brown and Caldwell

Project Schedule:  8/2006-5/2007 | Value:  $4,963,710

Avon and Edwards Drinking Water Facility - Sand Separator

Avon, CO and Edwards, CO

                                                                       Construction of an overflow manhole and sand separator

 

Owner:  Upper Eagle Regional Water Authority | Engineer:  HDR Engineering

Project Schedule:  8/2006-1/2007 | Value:  $376,528

Castlewood Pump Station

Denver, CO

                                           

                                           

Construction of a potable water pump station

 

Owner:  Denver Water | Engineer:  Denver Water

Project Schedule:  10/2006-4/2007 | Value:  $291,246

Platteville Water Treatment Plant

Platteville, CO

                                                        

                               

Improvements to chlorine basin and aeration system

 

Owner:  Town of Platteville | Engineer:  Ketterling, Butherus and Norton

Project Schedule:  7/2007-11/2007 | Value:  $327,487

 

Glenwood Springs Secondary Digester Cover Replacement

Glenwood Springs, CO

                                                                

                       

Secondary digester cover replacement

 

Owner:  City of Glenwood Springs | Engineer:  Burns and McDonnell

Project Schedule:  7/2006-11/2006 | Value:  $270,404

Eastern Water Treatment Plant Filter Modification

Castle Rock, CO

                                                  

                                     

Open media filter modification

 

Owner:  Town of Castle Rock | Engineer:  HDR Engineering

Project Schedule:  1/2007-4/2007 | Value:  $78,982

Tank No. 9B

Parker, CO

                                              

                                         

Construction of a post tension water storage tank

 

Owner:  Pinery West Metropolitan District| Engineer:  Bates Engineering

Project Schedule:  9/2005 - 11/2006 | Value:  $1,075,450

Laramie East Side Tank

Laramie, WY

                                   

                                   

Modifications of existing pump stations and sewer lines, and construction of new pump stations

 

Owner:  City of Laramie | Engineer:  Wester-Wetstein and Associates

Project Schedule:  8/2005 - 12/2007 | Value:  $4,973,439

Grange Hall Lift Station

Thornton, CO

                                     

                                 

Construction of a sub-grade sanitary sewer lift station

 

Owner:  City of Thornton | Engineer:  Boyle Engineering

Project Schedule:  2/2006-8/2006 | Value:  $593,419

 

Berkeley Park Pump Station

Denver, CO

                                                

                      

Construction of an irrigation pump station

 

Owner: City and County of Denver | Engineer:  City and County of Denver

Project Schedule:  11/2005 - 10/2006 | Value:  $253,771

Ruby Hill Pump Station

Denver, CO

 

 

                                                                                        

Irrigation modifications and booster pump station

 

Owner:  City and County of Denver | Engineer:  City and County of Denver

Project Schedule:  2/2006-10/2006 | Value:  $196,476

Eastern Water Treatment Plant HVAC Modifications

Castle Rock, CO

                                          

                            

HVAC modifications

 

Owner:  Town of Castle Rock | Engineer:  HDR Engineering

Project Schedule:  2/2006-7/2006 | Value:  $126,011

Castle Pines Lift Station No. 3

Castle Rock, CO

                                   

                                   

Replacement of owner furnished pumps and installation of overflow manhole

 

Owner:  Castle Pines North Metropolitan District| Engineer:  Rothberg, Tamburini and Winsor

Project Schedule:  2/2006-6/2006 | Value:  $177,982

Hutchinson Pump Station

Aurora, CO

                                

                                      

Construction of a pump station

 

Owner:  City of Aurora | Engineer:  HDR Engineering

Project Schedule:  2/2006-5/2006 | Value:  $301,994

 

Woman Creek Outlet Modifications

Westminster, CO

                                 

                                     

Installation of meter vaults, pumps and gates

 

Owner:  Woman Creek Reservoir Authority | Engineer:  Deere and Ault Consultants

Project Schedule:  2/2006-5/2006 | Value:  $190,820

Senac Cove Pond Pump Station

Aurora, CO

                                    

                                  

Construction of a pump station and dam spillway

 

Owner:  City of Aurora | Engineer:  Rothberg, Tamburini and Winsor

Project Schedule:  2/2006-5/2006 | Value:  $914,642

High Plains Lift Station

Aurora, CO

                                                                       

Construction of a sub-grade sanitary sewer lift station

 

Owner: City of Aurora | Engineer:  Stantec

Project Schedule:  5/205 - 10/2005 | Value:  $861,705

Boyd Lake Water Treatment Plant

Loveland, CO

 

 

Construction of a chemical storage building used for potable water treatment

 

Owner:  City of Greeley | Engineer:  Burns & McDonnell

Project Schedule:  2/2005 - 10/2005 | Value:  $725,886

Edwards Wastewater Treatment Plant

Vail, CO

 

                                    

Modifications to the locker room, upgrading an odor control system and replacing the outdated HVAC system

 

Owner: Eagle River Water and Sanitation District | Engineer:  Brown and Caldwell

Project Schedule:  2/2005 - 9/2005 | Value:  $822,054

 

Spurgeon Water Tank

Niwot, CO

 

 

Demolition of existing access hatch and tank vents and construction of new access hatch and tank vents,

in addition to concrete repair

 

Owner:  Left Hand Water District | Engineer:  Bates Engineering

Project Schedule:  1/2005 - 5/2005 | Value:  $112,805

  Turnberry Meadows Lift Station

Commerce City, CO

 

 

   Construction of a sub-grade sanitary sewer lift station

 

Owner:  South Adams County Water and Sanitation District | Engineer:  Black and Veatch

Project Schedule:  2/2005 - 7/2005 | Value:  $674,328  

Rocky Flats Industrial Water Project

Golden, CO

Installation of point of use water filtration and treatment system

 

Developer:  RAC Development | Engineer:  Jehn Engineering

Project Schedule:  11/2004 - 12/2004 | Value:  $79,027

Gilcrest Lagoon Lining

Gilcrest, CO

                                                  

                  

Furnish and install wastewater treatment plant lagoon lining

 

Owner:  Town of Gilcrest | Engineer:  RG Consulting Engineers, Inc.

Project Schedule:  10/2004 - 8/2005 | Value:  $156,976

 

Reservoir 4 Water Storage Tank

Parker, CO

 

                                                                                Construction of a post tension water storage tank

 

Owner:  Pinery Water and Wastewater District | Engineer:  Bates Engineering

Project Schedule:  12/2004 - 5/2005 | Value:  $962,587

124th Avenue Pump Station

Brighton, CO

 

 

Installation of wet well submersible pumps, slide gates and water flow meters

 

Developer:  Tetra Tech Construction | Engineer:  Tetra Tech Construction

Project Schedule:  10/2004 - 11/2004 | Value:  $32,235

Screw Pump Installation

Frederick, CO

                                   

Installation of owner furnished screw pump

 

Owner:  Weld County Tri-Area Sanitation District | Engineer:  Burns & McDonnell

Project Schedule:  9/04 - 11/04 | Value:  $73,308

Mitchell Creek Hatches

 

Installation of hatches, handrail, pump, piping and hoist crane base

 

Owner:  Town of Castle Rock | Engineer:  Town of Castle Rock

Project Schedule:  8/04 - 9/04 | Value:  $10,687

 

Well Facilities

Parker, CO

                                                                      Construction of three well facilities and all necessary appurtenances

 

Owner:  Meridian Metropolitan District | Engineer:  Tetra Tech RMC

Project Schedule:  6/2004 - 5/2005 | Value:  $1,733,842

Joder Water Storage Tank

Boulder, CO

                              

                                        

Construction of a post tension water storage tank

  

Owner:  Left Hand Water District | Engineer:  Bates Engineering

Project Schedule: 5/2004 - 3/2005 | Value:  $956,000

Well Sites 4 & 9

Peyton, CO

 

Construction of two well vaults with all pumps, valves and fixtures

 

Owner:  Meridian Service Metro District | Engineer:  URS Corporation

Project Schedule:  5/04 - 8/04 | Value:  $542,313

Bennett Pump Station

Bennett, CO

                                              

                     

Design/Build of pump station

 

Owner:  Town of Bennett | Engineer:  Jehn Engineering

Project Schedule:  4/2004 - 8/2004 | Value:  $301,388

Woody Creek Wastewater Treatment Plant

Aspen, CO

                                                                       

Construction of a new wastewater treatment plant

 

Owner:  Aspen Pitkin County Housing Authority

Project Schedule:  3/2004 - 5/2005 | Progress:  100% | Value:  $845,299

Reservoir 2 & 3

Parker, CO

                                  

                                    

Demolition of existing access hatch and tank vents, and construction of new access hatch and tank vents

 

Owner:  Pinery Water and Wastewater District | Engineer:  Bates Engineering

Project Schedule:  2/2004 - 8/2004  | Value:  $234,570

Meadows Siphon Facility Sewerage Grinder Project

Castle Rock, CO

 

 

Construction of a grinder vault, temporary bypass with no shutdown

 

Owner:  Town of Castle Rock |  Engineer:  URS Corporation

Project Schedule:  1/2004 - 7/2004 | Value:  $204,161

Roxborough Park Water Treatment Plant Improvements Project

Littleton, CO

 

 

                                                                                       

Replacement of existing chemical feed systems, flocculators, submersible pumps, filter gallery piping,

installation of new floating decanter, underground piping, VFD, concrete repairs

 

Owner:  The Roxborough Park Metropolitan District | Engineer:  TST Infrastructure, LLC

        Project Schedule:  1/2004 - 6/2004 | Value:  $517,322

Bell Cross Ranch Pump Station

Parker, CO

 

                                                                                     New potable water pump station, masonry building, and landscaping

 

Owner:  Parker Water and Sanitation District | Engineer:  RG Consulting Engineers, Inc.

                     Project Schedule:  11/2003 - 6/2004 | Value:  $474,532

Installation of UV Disinfection System

Fountain, CO

 

                                                                    Modification of an existing contact basin for installation of a UV disinfection system

 

Owner:  Security Sanitation District | Engineer:  Eckert Energy Efficiency Engineering

                 Project Schedule:  9/2003 - 12/2003 | Value:  $101,108

Genesee Box Culvert Entrance

Golden, CO

 

 Modification of an existing buried pump station to provide ground level access

 

Owner:  Genesee Water & Sanitation District | Engineer:  Genesee Water & Sanitation District       

Project Schedule:  7/2003 - 8/2003 | Value:  $17,984

Lincoln Meadows Sewage Lift Station

Parker, CO

 

                                                                                                                                                                               Construction of a new sewage lift station, 15' below ground water in sandy soil

 

Owner:  Lincoln Meadows Metropolitan District | Engineer:  EVO Consulting Services, Inc.

Project Schedule:  6/2003 - 12/2003 | Value:  $368,543

Grapevine Hollow Pump Station

Greeley, CO

 

                                                                                       Construction of an irrigation pump station and pond aeration system

 

Developer:  Union Colony Excavating | Engineer:  Drexel, Barrell & Co.

Project Schedule:  4/2003 - 4/2003 | Value:  $218,200

Mitchell Creek Lift Station

Castle Rock, CO

                                       

                                               

Modification of an existing aeration basin to a wet well/dry well sanitary pump station, new masonry building,

and demolition of old station

 

Owner:  Town of Castle Rock | Engineer:  HDR Engineering Inc.

Project Schedule:  2/2003 - 8/2003 | Value:  $970,841

Secondary Clarifier Treatment Improvements Project

Loveland, CO

                                  

                                    

 Replacement of clarifier mechanisms, regrouting of clarifier slab, and concrete repair

 

Owner:  City of Loveland | Engineer:  CH2M Hill

Project Schedule:  2/2003 - 10/2002 | Value:  $244,868

 Brantner Gulch Lift Station

Denver, CO

                                       

                                

Replacement of multishaft centrifugal pumps and installation of new polymer feed system

 

Owner:  Metro Wastewater Reclamation District | Engineer:  Carollo Engineers

               Project Schedule:  6/2002 - 4/2003 | Value:  $492,072

Strontia Springs Dam Intake Tower – Jib Crane Replacement

Denver, CO

                                                                       

 

Replacement of an existing 12 ton jib crane

 

Owner:  Denver Water | Engineer:  Denver Water

Project Schedule:  4/2002 - 8/2002 | Value:  $168,545

Genesee Terrace Lift Station

Golden, CO

                                                                                        

Construction of a new wet well/dry well wastewater pumping station

 

Owner:  Genesee Water & Sanitation District | Engineer:  Jacobson Helgoth Consultants

              Project Schedule:  4/2002 - 11/2002 | Value:  $493,840

 Installation of Pump Station at Sanborn Park

Greeley, CO

                 

                       

                                              

  Replacement of pump equipment, associated piping and minor site development

 

Owner:  City of Greeley | Engineer:  City of Greeley

Project Schedule:  3/2002 - 4/2002 | Value:  $23,881

Lincoln Junior High School Pump Station

Fort Collins, CO

 

 Supply and installation of a pumping system for turf irrigation

 

Owner:  Poudre School District R-1 | Engineer:  Poudre School District

 Project Schedule:  2/2002 - 5/2002 | Value:  $48,462

 

Glen Grove Water Treatment Plant

Filter Replacement and Site Modifications

Perry Park, CO

                   

                     

   

Refurbishment of potable water pressure filters, new chemical storage facility, relocation of chemical systems,

piping modifications and site development

 

Owner:  Perry Park Water and Sanitation District | Engineer:  The Engineering Company

 Project Schedule:  12/2001-4/2002 | Value:  $130,000

 

City of Black Hawk Water System Improvements

Black Hawk, CO

                                

                                                      

Construction of potable water pump station, PRV vault, existing utility modifications, controls and minor site development

 

Owner:  City of Black Hawk | Engineer:  Richard P. Arber Associates

         Project Schedule:  12/2001 - 6/2002 | Value:  $287,557

Maplewood Estates Off-Site Sewer & Lift Station Improvements

Eaton, CO

 

Subcontract work for construction of non-potable water lift station, including wetwell, pumping system, controls,

and minor site development

 

Owner:  Town of Eaton | Engineer:  Ketterling, Butherus & Norton Engineers, LLC

 General Contractor:  Farner Enterprises

Project Schedule:  10/2001 - 4/2002 | Value:  $74,200