Current Projects

Greeley Aeration System Improvements

Owner:  City of Greeley | Engineer: 

Project Schedule:  | Progress: 0% | Value:

 

Specifications and Drawings

 

 

 

Andrews WST

Owner:  Left Hand Water | Engineer:  Bates Engineering

Project Schedule:  | Progress: 0% | Value:

 

 

Specifications and Drawings

 

 

 

Rocky Ford

Owner:  City of Rocky Ford | Engineer: 

Project Schedule:  | Progress: 0% | Value:

 

Specifications and Drawings

 

 

 

Cold Springs

Owner:  Colorado City | Engineer:  Malcolm Pierne

Project Schedule:  | Progress: 0% | Value:

 

Specifications and Drawings

 

 

Columbine Well No. 1

Owner:  City of Manitou Springs | Engineer: 

Project Schedule:  | Progress: 0% | Value:

 

 

Specifications and Drawings

 

 

Lamar WWTP

Owner:  City of Lamar | Engineer:  The Engineering Company

Project Schedule:  | Progress: 0% | Value:  

 

Specifications and Drawings

 

La Junta WST and Pump Station

Owner:  City of La Junta | Engineer:  The Engineering Company

Project Schedule:  | Progress: 0% | Value:  

 

Specifications and Drawings

 

 

Boyd Lake PAC Silo

Owner:  City of Greeley | Engineer:  City of Greeley

Project Schedule:  | Progress: 0% | Value:  $192,870

 

Specifications and Drawings

 

Three Gate Valve Replacement

Owner:  City of Greeley | Engineer:  Integra Engineering

Project Schedule:  | Progress: 0% | Value:  $188,000

 

Specifications and Drawings.htm

 

 

South Tank Interconnect to LTWC

Owner:  City of Loveland | Engineer:  Clear Water Solutions

Project Schedule:  | Progress: 0% | Value:  $93,269

 

Specifications and Drawings

 

 

 Adams Street Lift Station

 

Owner:  City of Laramie | Engineer:  The Engineering Company

Project Schedule:  | Progress: 0% | Value:  $729,500

 

Specifications and Drawings

Cat Pump Station and Miller Reservoir

Construction of a new pump station, intake and outfall structure and

rehabilitation of reservoir lining for the Cat reservoir. 

Upgrade electrical and instrumentation equipment at existing pump station at Miller reservoir.

 

Owner:  Denver Water | Engineer:  Denver Water

Project Schedule: 9/2008 - 6/2009 | Progress: 10% | Value:  $3,536,088

Lambertson Lakes Dam No. 3 Rehabilitation

 

Demolition of an outdated existing dam, installation of new earthen dam,

concrete spillway structure and improvements to sewer system

 

Owner:  City of Thornton | Engineer:  RJH Consultants, Inc.

Project Schedule: 11/2008 - 5/2009 | Progress: 50% | Value: $1,702,080

 

Specifications and Drawings

South Adams County Lift Station No. 2

Addition to an existing lift station, including building construction and furnishing

and installing 5 new 1,100 gpm wastewater pumps

Owner:  South Adams County Water and Sanitation District | Engineer:  Black and Veatch

Project Schedule: 4/2009-11/2009 | Progress: 0% | Value:  $1,227,965

Specifications and Drawings

Wolcott WST

 

 

 

Construction of a .4MGD steel tank to include pipe work, pre-cast manholes

and vaults, and electrical work  

 

Owner: Eagle River Water and Sanitation District | Engineer: Bates Engineering

Project Schedule: 4/2008- 5/2009 | Progress: 95% | Value: $1,267,000

 

Specifications and Drawings

Inverness Pump Station

Construction of a new sewer lift station, modifications to
existing blower building and headworks building, new emergency generator and site improvements

Owner:  Inverness Water and Sanitation | Engineer:  Richard P. Arber

Project Schedule: 8/2008 - 4/2009 | Progress: 80% | Value:  $993,066

 

Specifications and Drawings

Reuter Hess Dam and Reservoir Enlargement

 

Mechanical installation for dam and reservoir

Owner:  Parker Water and Sanitation | Engineer:  RJH Consultants | General Contractor:  Ames Construction

Project Schedule: 3/2009 - 9/2009 | Progress: 0% | Value:  $897,260

 

Semper WTP

Expansion of the Semper WTF to include new building, electrical, HVAC

and relocation of chemical storage and pumps

 

Owner:  City of Westminster | Engineer:  Boyle Engineering/AECOM

Project Schedule: 4/2009 - 9/2009 | Progress: 0% | Value: $442,583

 

Specifications and Drawings

UCD Cup Surge Tank #2 Addition

 

 

Installation of surge tank, associated piping and modifications to mechanical and control systems

 

Owner:  University of Colorado at Denver | Engineer:  RMH Group

Project Schedule: 10/2008 - 4/2009 | Progress: 40% | Value: $286,000

 

Specifications and Drawings