Carter Lake Hydroelectric Plant Construction of power house facility for two 1500KVA turbine generators Owner: Northern Water Hydropower Water Activity Enterprise | Engineer: Black & Veatch Project Schedule: 8/2011-6/2012 | Progress: 2% | Value: $1,774,669
Bellvue Drying Beds Installation of a large asphalt drying bed for sludge containment Owner: City of Greeley | Engineer: Smith Geotechnical Engineering Consultants Project Schedule: 8/2011-12/2011 | Progress: 1% | Value: $832,600
CDOC WWTP Pretreatment Facilities Construction of pre-treatment facility structures and screening handling equipment at the Mackenzie and Brewster outfall structures. Owner: Colorado Department of Correction | Engineer: Richard P Arber Project Schedule: 3/2011-11/2011 | Progress: 85% | Value: $1,342,272
Milton Seaman Reservoir Outlet Maintenance Installation of a trash rack structure and replacement of existing hydraulic gate. Owner: City of Greeley | Engineer: URS Project Schedule: 2/2011-3/2012 | Progress: 2% | Value: $1,150,530
Greeley Lift Station 13 Box Culvert Construction of a lift station and a box culvert Owner: City of Greeley | Engineer: KBN & AVI Project Schedule: 6/2011-8/2011 | Progress: 0% | Value: $790,000
Benkelman WTP Construction of a water treatment facility Owner: City of Benkelman | Engineer: Baseline Engineers Project Schedule: 4/2011 - 1/2012 | Progress: 0% | Value: $921,000
Nederland Construction of a wastewater treatment plant Owner: Nederland | Engineer: Frachetti Engineering Project Schedule: 3/2010-3/2011 | Progress: 0% | Value: $3.8 Million
Greeley Aeration System Improvements Replacement of blowers and air piping in existing blower building and installation of new diffuser system in aeration basins, with associated building modifications and landscaping. Owner: City of Greeley | Engineer: Brown and Caldwell Project Schedule: 2/2010 - 10/2010 | Progress: 20% | Value: $2,324,970
|